The landslide blocked the track, leading to the suspension of train operations to ensure the safety of passengers and protect the railway infrastructure. The goal of this meeting was to coordinate efforts for clearing the debris and restoring the disrupted rail line as soon as possible. Given the complexity of the terrain and the scale of the debris, the restoration process is being coordinated with state authorities and the NHAI to ensure that the work proceeds as smoothly as possible.
Author: The Hills Times
Published at: 2025-06-24 22:30:00
Still want to read the full version? Full article